
The following works have been completed for the approximately 168 km Manavgat – Seydişehir railway line: route selection; geological, geotechnical, hydrogeological, engineering geology, and hydrologic-hydraulic studies; preparation of implementation designs for engineering structures; and the final design of the infrastructure and superstructure along the route.