AKÇAKALE-NUSAYBİN (226 KM) RAILWAY
AKÇAKALE-NUSAYBİN (226 KM) RAILWAY
Catalog Title : IMPLEMENTATION OF SECOND RAILWAY LINE BETWEEN AKÇAKALE - NUSAYBİN (226 KM) STATION
Client / Main Contractor : TCDD 6. REGIONAL DIRECTORATES – ADANA
Sub-Contractor : KMG Project Eng. Cons. Inf. Tech. Ltd. Co.
Surveying Works for 226 km, Route Study for 160 km/h and 200 km/h speed, Preparation of Alignment Projects scaled to 1/2000, hydrological study, geological and geotechnical studies, structural design works, Environmental Impact Assessment Report, Land Expropriation Plans for 3 km and Bill of Quantities.