KARS-IĞDIR-ARALIK-DİLUCU RAILWAY
KARS-IĞDIR-ARALIK-DİLUCU RAILWAY
Catalog Title : KARS-IĞDIR-ARALIK-DİLUCU RAILWAY
Client / Main Contractor : MINISTRY OF TRANSPORT AND INFRASTRUCTURE, GENERAL DIRECTORATE OF INFRASTRUCTURE INVESTMENTS
Sub-Contractor : Yuksel Domaniç Eng. Ltd. Co. - KMG Project Eng. Cons. Inf. Tech. Ltd. Co.
Design works performed for 203.90 km Double Track with maximum project speed of 160 km/h including Geodetic, Soil Investigation Studies, Geotechnical Design, Railway Alignment Design, Hydraulic-Hydrological Projects, Structural Design Services, Electromechanical Projects, Preparation of Tender Documents. The Projects has 480 Culverts, 144 Underpasses, 27 Overpasses, 5 Tunnels, 19 Cut and Cover Tunnels, 10 Bridges and 3 Viaducts.