Ordu-Giresun Airport
Ordu-Giresun Airport
The following works have been completed for a total construction area of 47,983.98 m²: preparation of final, implementation, and detailed construction projects; preparation of cost estimates, quantity surveys, unit price analyses, general technical specifications, special technical specifications, and progress payment tables; implementation designs for internal parcel and main access roads; implementation projects for parking and maneuvering areas, including the arrangement of entrances and exits to buildings and parking facilities.
Additionally, implementation designs for the site installation gallery, potable water, wastewater, garden irrigation, stormwater, fire water, heating, cooling systems, and their distributions have been prepared. Borehole drilling works conducted on both land and sea, geological surveys, geotechnical reports, and external low-voltage distribution projects (telephone, data, and fire alarm systems) have also been completed.